BRIEF DESCRIPTION OF THE GOODS AND/OR SERVICES PROVIDED
STATUS
1.
1 – Office Supplies
United Nations High Commissioner for Refugees (UNHCR)
23 September 2023 – 23 September 2025
Framework Contract for the Supply of Office Furniture (150pcs) – Reference No.ITB/HCR/SOD/2023/004 (DDB/HCR/SOD/2023/012)
Completed
2.
2 – Information Technology and Communication Supplies
United Nations High Commissioner for Refugees (UNHCR)
16 January 2016
Purchase Order for Goods/8232 for the Supply of various IT and Office items/accessories on need basis.
– PO No.KEN01 – 0000008232
Completed
3.
3 – Education Supplies
Save the Children
31 August 2026
School supplies: School Uniform kits for ABE Learners
On-going
4.
5 – Water, Sanitation and Hygiene (WASH) Supplies
Qatar Charity (UNHCR Funded Project)
26 August 2024
Scope of Works:
Construction of Tap Stands in IFO 2 Refugee Camp – Dadaab Kenya.
Ref. No.RFP/002WaSH/UNHCR + Qc – Ke/2024
Completed
5.
5 – Water, Sanitation and Hygiene (WASH) Supplies
World Vision
01 – 31 August 2024
Scope of Works:
Construction and Erection of Steel 6M High Steel Structure for Water Storage, Supply of Water Tanks, Installation of Drip Kits, Fencing of Alikune, Gubakibir, and Dolal CBO Farmlands, Piping and Plumbing works in Dadaab Kenya.
Completed
6.
5 – Water, Sanitation and Hygiene (WASH) Supplies
Peace Winds Japan (PWJ) – UNICEF Funded Project
29 September – 30 October 2023
Scope of Works:
Water Supply Connection, Construction of 2 Blocks of Latrines, Plumbing works and Repairs for Bogyar Primary School in Dadaab Kenya.
Completed
7.
6 – Emergency Non-Food Items (NFI) Supplies
United Nations High Commissioner for Refugees (UNHCR)
23 September 2023 – 23 September 2025
Framework Contract for NFIs Supplies:
Framework Contract for the Supply of Emergency Items: Office Furniture (150pcs), New Gas Cylinders (32pcs), Gas Refills 13kg (80pcs), Gas Refills 50kg (20pcs), Regulators (50pcs)
Reference No.ITB/HCR/SOD/2023/004 (DDB/HCR/SOD/2023/012)
Completed
8.
6 – Emergency Non-Food Items (NFI) Supplies
United Nations High Commissioner for Refugees (UNHCR)
09 October 2024 – 08 October 2025
Framework Contract for the Supply and Delivery of refreshment for UNHCR Sub Office, Dadaab – Contract: FA/HCR/SOD2023/016
Completed
9.
9 – Energy and Power Solutions
Peace Winds Japan (PWJ) – UN OCHA Funded Project
29 July – 22 September 2026
Scope of Works:
Solarization of Borehole 1 in IFO 2 Dadaab Refugee Camp Dadaab Sub County, Garissa County – Supply, delivery, installation and testing of Solar PV panels, solar Inverter, back up batteries and related wiring and electrical connections, as per BQ, and testing the system for functionality within DADAAB IFO 2 -PWJ/DDB/UNOCHA/CON/020A
On-going
10.
9 – Energy and Power Solutions
Finn Church Aid (FCA)
08 June – 20 September 2026
Scope of Borehole Rehabilitation Works:
– borehole inspection and condition assessment
– borehole flushing and cleaning
– test pumping and yield assessment
– supply and installation of submersible water pumps
– rehabilitation and replacement of raising pipeline mains
On-going
10.
9 – Energy and Power Solutions
Finn Church Aid (FCA)
08 June – 20 September 2026
Scope of Borehole Rehabilitation Works:
– borehole inspection and condition assessment
– borehole flushing and cleaning
– test pumping and yield assessment
– supply and installation of submersible water pumps
– rehabilitation and replacement of raising pipeline mains
– Solarization of borehole pumping systems
– supply and installation of solar mounting structures and photovoltaic panels
– construction of elevated water storage structures
– supply and installation of water storage tanks
– extension of water distribution pipelines
– construction of water kiosks and tap stands
– construction of livestock watering troughs
– rehabilitation of generator systems
– rehabilitation of electrical and control systems
– testing, commissioning and handover of completed works.
On-going
11.
9 – Energy and Power Solutions
Finn Church Aid (FCA)
08 February – 30 May 2024
Scope of Works:
– Baraki Borehole Repairs of Solar System (Supply and replacement of inverter, 9 solar 195W Panels and Branding).
– Guro Borehole Rehabilitation of Solar System, Repair of Water Tanks and Branding).
– Libahlow Borehole Solarization and Branding.
Completed
12.
12. Logistics Services
UNITED NATIONS
HRA-Kenya
UNRC Office, Rm P 133 Gigiri Complex, P. O. Box 67578,
Nairobi
Kenya
01 July 2025
Provision of Passenger Ground Service – PURCHASE ORDER NUMBER
2300406529
Completed
13.
12. Logistics Services
Terre des hommes
03 July 2023 – 30 June 2024
Vehicle Lease – Landcruiser
Completed
14.
18 – Water and Sanitation Services
Peace Winds Japan (PWJ) – UN OCHA Funded Project
01 July – 10 August 2026
Scope of Works:
Borehole Drilling and Equipping at Hagadera Refugee Camp – Reference No. PWJ/KKM-DDB/UNOCHA/017C
Completed
15.
20 – Construction Works
Lutheran World Foundation (LWF)
22 February – 30 June 2024
Scope of Works: Construction and Equipping of 2 (two) Laboratories for Junior Secondary Schools in Dadaab Refugee Camp – Contract No. LWF/KAK/EDUCATION/29342/2024